Published on 19 May 2011 Hits: 483
Print

New London Seamless Gutters has repaired the issues that we were facing with the gutters. They removed the entire gutter and brackets made a new length of gutter and affixed it using new brackets. The new gutter was installed with a more aggressive pitch and an additional downspout was added at the opposite end with only about 6-8 ft of gutter pitched towards the additional downspout. The additional downspout was installed as a relief downspout in the event the rest of the gutter is full it will have an alternative place to drain. After two decent rain storms it appears to be holding up to the large amount of water that comes off this roof. Thanks to NLSG for keeping true to their workmanship and warranty, thank you!

Last Updated on Sunday, 10 July 2011 13:45

Site Updates

Bugs

Still working out a few bugs, but as you can see I am getting a few posts up here and there. Hopefully full functionality and feel will be up soon!

| + - | RTL - LTR